Scope
What we clean
Seven scopes, each with its own standard operating procedure, acceptance criteria and quoted work window. On a construction programme they are sequenced into the phases above; on an operating hall they are bought individually. Pick the one you are specifying.
The five-phase clean-build programme: base build and shell, rough-in and cable pull, the pre-fit-out deep clean 24 to 48 hours before rack roll-in, controlled cleaning through fit-out, and a final clean measured against ISO 14644-1 Class 8 acceptance criteria.
Read the scope →
The controls that keep construction dust out of the airstream and out of the air handling system while the trades are still working — wrapped units, sealed plenum, entry hygiene, filtration, and the particle checks that verify it.
Read the scope →
Surface-level floor care: HEPA vacuuming of perforated tiles, edge-vac of perimeters, damp mop with anti-static microfiber, scuff and adhesive residue removal, auto-scrub of slab aisles.
Read the scope →
Tile pulls and under-floor decontamination: HEPA vacuuming of the plenum, pedestals and stringers, wipe-down of tile undersides with lint-free anti-static cloths. Quoted as scoped work.
Read the scope →
Cable tray lips, exteriors, ladder tray supports, strut, brackets and drop verticals. Worked top-down from ladders to 12 ft, with cleaner applied to the cloth and never sprayed above equipment.
Read the scope →
Fixed panels, swinging and sliding doors, roof panels, strip curtains and aluminium framing — cleaned without scratching acrylic or reintroducing dust to the airstream.
Read the scope →
Rack doors, side panels, tops, handles and ledges. Exterior surfaces only — no internal components, no cabling, no PDUs, nothing inside the rack is touched.
Read the scope →
Rotational programmes across multiple halls — one hall at a time, cable tray to floor, repeating for the contract term. Staffed to a defined work window with per-visit sign-off.
Read the scope →